Sunday, June 27, 2010

Staging Completed and Ready for Wiring

Here's the east end all done. Magnetic bridges will be installed to run across the aisle.
These are the ends of the locomotive staging tracks. Since I run DC, I split each track into four blocks. The caulking hasn't dried yet on the track to the right. You can see the couple height gauge on the track. A great place to put it.
The two mainlines are on the left, and the track at the far right is the runaround track.

Even though none of the tracks are wired yet, I couldn't resist lining up a couple trains.

Now I gotta order the wire and plexiglas for the control panel. Then it'll be on to Toluca.